Condominium: reducing waste

The building located in Milan needs to reduce waste given the high costs of heating.

The structure consists of:

  • 1 buildings, 6 floors

ul>ul>

  • 1 natural gas boiler with total power of 667 kW, 182 days winter season activity 2022-23
    • 28.757,8 Annual smc

    Objective:

    The structure needed an optimized management of the switching times according to the different daily activities, with flexible sharing of the ignitions, remotely planned.

    Results

    In the previous graph we see the test ON-OFF: the blue color represents the consumption of a warm-up day without the use of the BRAIN system, the orange color, instead, the days when the BRAIN system is lit.

    The structure thanks to the system has achieved a seasonal saving of 19.7 %, equal to 7,055.1 Smc of methane gas, 13.91 tons of CO2.